Industrial Solar EPC — Faisalabad, Punjab

Industrial Solar Systems
for Factories & Mills in Faisalabad

End-to-end solar EPC for textile mills, manufacturing plants, and commercial facilities. Cut electricity costs by up to 90% with a fully engineered solar power system.

20+ MWIndustrial Installed
3.6 MWLargest Single Project
90%Max Bill Reduction
2–5 YrTypical ROI

Why Industrial Solar Is the Smartest Investment for Faisalabad Factories

Faisalabad's industrial sector — textiles, ginning, chemicals, food processing — faces electricity tariffs exceeding Rs. 50–60/unit for commercial and industrial consumers. With solar, you generate electricity at an effective cost of Rs. 6–10/unit over the system's 25-year life. For a factory consuming 200,000 units per month, that translates to Rs. 8–11 million in annual savings.

Saigal Solar Solutions has been engineering and installing large-scale solar systems in Faisalabad since 2015. We are an authorized LONGi Flagship Store and official Solis distributor — the two dominant brands in industrial solar globally — which means you get factory-direct pricing on Tier 1 Grade A components.

Up to 90% Bill Reduction

Replace expensive grid electricity with solar energy priced at Rs. 6–10/unit over the system lifetime. Most industrial clients see 70–90% reduction in WAPDA bills.

3–5 Year Payback

Industrial solar ROI in Pakistan is among the fastest in the world due to high tariff rates and excellent solar irradiation in Punjab — averaging 5.2–6 peak sun hours daily.

Net Metering Revenue

Export surplus electricity to FESCO/LESCO/IESCO at regulated buyback rates. With an oversized system, your meter can run backwards and generate revenue during weekends and holidays.

25-Year System Life

LONGi panels carry a 30-year performance warranty. Solis inverters a 5-year standard (extendable). The system continues generating value long after full payback.

Industrial Solar Services We Offer

We provide a complete design, engineering, procurement, construction (EPC) and commissioning package — one vendor, full accountability. If you have already procured some or all materials and need our design, engineering, installation and commissioning services only, we offer that too.

  • Load Analysis & Feasibility Study — We review your WAPDA bills and running Loads and calculate optimal system size
  • Rooftop Structural Assessment — our engineers evaluate your roof's load capacity and orientation
  • System Engineering & Design — AutoCAD layouts, shade analysis, string design, and single-line diagrams
  • Supply of all components — Panels, Inverters, Mounting, DC/AC Cables, Protection Devices
  • Civil & Electrical Installation — certified team with experience on industrial sites
  • WAPDA/DISCO net metering application — we handle the complete regulatory process
  • Commissioning & handover — full system testing and Cloud monitoring setup or in-house localised real-time monitoring
  • Annual Maintenance Contracts (AMC) — Optional ongoing O&M Services

Industrial Sectors We Serve

🧵 Textile & Allied Industries

Spinning mills, weaving units, ginning factories, dyeing facilities. We have completed multiple 100–1500kW textile solar projects in Faisalabad.

🏭 Manufacturing & Engineering

Steel fabrication, plastic moulding, food processing, pharmaceutical plants. Any facility with a large rooftop and 3-phase WAPDA connection.

🏪 Commercial Complexes

Shopping centres, plazas, hospitals, educational institutions, cold storage warehouses. We design systems that match your load profile.

🚜 Agricultural & Agro-Industrial

Cotton ginning, rice mills, flour mills, tube wells. Ground-mounted or rooftop solar systems for rural and peri-urban industrial facilities.

Our EPC Process — From Survey to Switch-On

1

Free Site Survey & Bill Analysis

Our engineer visits your facility, measures the rooftop, reviews WAPDA bills, and analyses your load profile. This is completely free and without obligation.

2

Detailed Proposal & ROI Report

Within 48 hours, you receive a detailed technical and commercial proposal including system layout, component specifications, yield projections, cost, and a 10-year ROI model.

3

Contract & Procurement

Upon agreement, we place orders for all components. Being an authorized distributor for LONGi and Solis means shorter lead times and factory warranty support.

4

Civil & Electrical Installation

Our certified installation team completes the full installation — typically 2–4 weeks for 100–500kW systems — with minimal disruption to your operations.

5

Net Metering Application & Commissioning

We submit your net metering application to FESCO/LESCO and coordinate all DISCO approvals. Once approved, we commission the system and hand over monitoring access.

Get a Free Industrial Solar Feasibility Study

Send us your latest 3 WAPDA bills and we'll deliver a detailed ROI analysis within 48 hours — no cost, no obligation.

Industrial Solar — Common Questions

Industrial solar in Faisalabad typically costs between Rs. 60–90 per watt installed for systems above 100kW, including panels, inverters, mounting, wiring, and commissioning. A 500kW system costs approximately Rs. 35–45 million. Exact pricing depends on roof structure, cable runs, and inverter configuration.
Industrial solar ROI in Pakistan is typically 2 to 5 years depending on your current tariff category and system size. After payback, you effectively get free electricity for 20+ years. Our free feasibility study provides a site-specific 10-year financial model.
Yes. Most industrial facilities run on 3-phase power. We install 3-phase on-grid or hybrid solar systems using Solis, FoxESS, or Huawei 3-phase inverters that synchronise perfectly with your existing WAPDA connection and are approved for net metering.
Yes — we handle the complete net metering application with FESCO/LESCO/IESCO on your behalf, from DG&A and DISCO approval to commissioning and meter changeover. Typical industrial net metering takes 6–10 weeks after system installation.
Our largest completed project is a 3,600kW installation for a Textile Weaving manufacturing facility in Faisalabad. We regularly handle systems in the 50–5,000kW range and can coordinate larger projects in partnership for multi-MW sites.